ποΈ Maritime terminal prepares for influx of redirected ships as Baltimore bridge cleanup continues
πΏSemantically Similar Articles (by :title_embedding)
- ποΈ 19.4 π Apr01 Crews cut apart Baltimore bridge wreckage, temporary channels being prepared for shipping (π° US general3)
- ποΈ 21.9 π Apr01 Temporary shipping channel in Port of Baltimore opens for emergency, salvage crews (π° US general16)
- ποΈ 22.0 π Apr01 Alternate channels to Port of Baltimore opening as salvage operation continues (π° US general3)
- ποΈ 22.2 π Apr02 Channel opened for vessels clearing collapsed Baltimore bridge site (π° Feedburner Euronews)
- ποΈ 22.2 π Apr01 A channel has opened for vessels clearing wreckage at the Baltimore bridge collapse site (π° US general1)
Maritime terminal prepares for influx of redirected ships as Baltimore bridge cleanup continues
2024-04-03
-
(from ABC News: US)
The only maritime shipping terminal currently operating in the Port of Baltimore is preparing to process an influx of redirected ships as crews continue clearing the wreckage of the collapsed Francis Scott Key Bridge
empty
[π§ ] [v1/3] title_embedding_description: {:ricc_notes=>"[embed-v3] Fixed on 9oct24. Only seems incompatible at first glance with embed v1.", :llm_project_id=>"unavailable possibly not using Vertex", :llm_dimensions=>nil, :article_size=>484, :poly_field=>"title", :llm_embeddings_model_name=>"textembedding-gecko"}
[π§ ] [v1/3] summary_embedding_description: {:ricc_notes=>"[embed-v3] Fixed on 9oct24. Only seems incompatible at first glance with embed v1.", :llm_project_id=>"unavailable possibly not using Vertex", :llm_dimensions=>nil, :article_size=>484, :poly_field=>"summary", :llm_embeddings_model_name=>"textembedding-gecko"}
[π§ ] As per bug https://github.com/palladius/gemini-news-crawler/issues/4 we can state this article belongs to titile/summary version: v3 (very few articles updated on 9oct24)
πΏarticle.to_s
------------------------------ Title: Maritime terminal prepares for influx of redirected ships as Baltimore bridge cleanup continues Summary: The only maritime shipping terminal currently operating in the Port of Baltimore is preparing to process an influx of redirected ships as crews continue clearing the wreckage of the collapsed Francis Scott Key Bridge [content] empty [/content] PublishedDate: 2024-04-03 Category: USA NewsPaper: ABC News: US Tags: US
"title"=>" Maritime terminal prepares for influx of redirected ships as Baltimore bridge cleanup continues",
"summary"=>"The only maritime shipping terminal currently operating in the Port of Baltimore is preparing to process an influx of redirected ships as crews continue clearing the wreckage of the collapsed Francis Scott Key Bridge",
"content"=>"",
"author"=>nil,
"link"=>"https://abcnews.go.com/US/wireStory/maritime-terminal-prepares-influx-redirected-ships-baltimore-bridge-108811343",
"published_date"=>Wed, 03 Apr 2024 21:18:22.000000000 UTC +00:00,
"image_url"=>"https://s.abcnews.com/images/US/wirestory_2c0273f1e6ef2340a17b4cd25469a780_4x3_384.jpg",
"feed_url"=>"https://abcnews.go.com/US/wireStory/maritime-terminal-prepares-influx-redirected-ships-baltimore-bridge-108811343",
"language"=>nil,
"active"=>true,
"ricc_source"=>"feedjira::v1",
"created_at"=>Sat, 06 Apr 2024 20:20:18.720252000 UTC +00:00,
"updated_at"=>Mon, 21 Oct 2024 19:30:00.716391000 UTC +00:00,
"newspaper"=>"ABC News: US",
"macro_region"=>"USA"}